Electrical Projects

Consumer Unit/Fuse Board Installation

Location: Clevedon

Value: £600

Time Taken: 1 day

To replace existing consumer unit with new unit including full RCD protection for customers peace of mind and safety. All works fully tested and certificated to NICEIC requirements.

Read more

Consumer Unit/Fuse Board Installation

Electric Flow Boiler Installation

Location: Marina, Portishead

Value: £3,500.00

Time Taken: 1.5 Days

Electrical heating replacement involving the removal of a Gledhill Electromate 2000 existing unit. Works involved the installation of an innovative Heatrae Sadia space saving Amptec electric flow boiler and Megaflo pressurised hot water system. All works carried out with minimal disruption to customer and new system fully operational in less than 2 days.

Read more

Electric Flow Boiler Installation
  • "“Value for money and friendly.”"

    Mrs James, Portishead

  • "'Very pleased we made the call to Mathison's. You can be proud of the level of professionalism that Tom and Lewis showed throughout their time in our home. I am going to be more than happy to recommend Mathison's to friends and family'"

    Mr Thompson, Weston Super Mare

  • "“I just wanted to drop you a line to thank you and your team at Mathison for your very positive approach to our enquiry this week. After a somewhat negative approach from the company we had used for the servicing of our old boiler when we had no hot water I am very pleased that my next call was to Mathison’s. I would particularly like to thank Tom and Lewis for the quality of the work they have done and for keeping me informed of progress. You can be proud of the level of professionalism they both showed throughout their time in our home. I am going to be more than happy to recommend Mathison’s to friends and family.”"

    Mr & Mrs Thompson, Weston Super Mare

  • "'Many thanks for your excellent service as always'"

    Mrs Woodman, Bristol

  • "“Both my wife and I were very impressed and grateful for your speedy response to our urgent need for a replacement boiler. We were also very impressed by your installation team – Jeremy and Tom. Both worked conscientiously and efficiently throughout the installation period. I would have no hesitation in recommending your company to anyone requiring a similar service.”"

    Mr & Mrs Bath, Wrington

  • "'I would just like to say thank you to yourself and your team for the first class service we received last week. Your amazing engineers walked up the hill to us in the snow with rucksacks on their backs to fix our boiler and tend to a broken pipe. Service that was above and beyond from start to finish'"

    Mrs McBride, Clevedon

  • "‘The team worked with speed, accuracy and professionalism and always cleaned their mess behind them. We were extremely impressed and pleased with all the work’"

    Mr & Mrs Lark, Portishead

  • "'We would like to say a big thank you to all who attended so promptly to our recent boiler situation. It was an amazing service and we would certainly continue to recommend you'"

    Mr & Mrs Shilton, Pill

  • "“My oil boiler broke down during the worst snow storm we have had for many years and Mathison’s came out in a 4 x 4 to my property which is in a ‘hard to reach’ area.The engineer was able to repair my boiler within an hour of him arriving which was great as I have a new born baby and I was worried about the temperature in the house. Would 110% recommend them to anyone.”"

    Ms Lupton, Yatton